RFT 9708 60L100 Transmission

Client: BC Hydro & Power Authority

Location: Highway 10 between 164th and 160th Street, Surrey BC

Completion Date: November 30, 2018

Scope/Description:

  • All rail work.
  • LLP pole setting on the rails due to pole heights.
  • Environmental coordination and sensitive habitat (water shrew).
  • Rail flatting and trail schedule coordination.
  • Highway 10 and 168 diversion coordination with the general public.
  • Local business and traffic diversions.
  • Multiple rail coordination with PNR, CP, CN, and SRY Rail.

Highlight(s):

  • Stringing 1 – 2 km at a time over hot distribution
  • New method for installing culverts to minimize ground disturbance and eliminate undermining railway.